Commercial Roof Replacement
Planned Around Your Building

When a roof is past saving, Bloom specifies the system against what your building does to its own roof, then plans tear-off, staging and work windows around the people and operations below.

Confirm the Scope Before Committing to Replacement

The right approach depends on the existing roof assembly, moisture conditions, deck condition, drainage and project requirements. Different roof areas may need different responses, so evaluate the building before assuming a full replacement is necessary.

A recover adds a new system over an existing assembly that can carry it. A tear-off removes specified materials so the conditions underneath can be addressed. Verified conditions, code and manufacturer requirements decide which one you get. Further investigation may be needed first, and restoration is sometimes worth comparing.

Project steps

How a Replacement Project Runs

  1. 01

    Evaluation and scope

    Review the existing assembly, conditions and project requirements, then define the proposed scope and system.

  2. 02

    Coordination and phasing

    Plan staging, access, work sequencing and temporary weather protection around the building and its operations.

  3. 03

    Installation and closeout

    Install the agreed assembly, complete required inspections and hand over the project documentation.

Systems

Choosing the Right System

Bloom installs TPO, EPDM, PVC and modified bitumen. System selection considers exposure, drainage, roof traffic, attachment, building requirements and manufacturer specifications. Compatibility must be confirmed for the actual conditions.

  • TPO

    A heat-welded thermoplastic single-ply membrane, commonly supplied in light colors.

  • EPDM

    A synthetic rubber single-ply membrane, available in wide sheets and installed with adhered, fastened or ballasted methods.

  • PVC

    A heat-welded thermoplastic single-ply membrane, with formulations and reinforcement that vary between products.

  • Modified bitumen

    A multi-ply asphalt-based system, often chosen where a thicker, layered assembly suits the building.

Pricing

What Affects the Cost

Replacement pricing depends on the building and the details more than on area alone. The scope is priced after the roof has been reviewed.

  • Access and staging

    Where lifting equipment and materials can be positioned, and what must be protected to get them there.

  • Building height

    Height affects the lifting equipment and how long it is needed.

  • Deck type and condition

    The deck affects attachment methods, and deterioration found during work can add scope.

  • Existing layers

    The number of existing roofs and whether any suitable insulation can remain affect removal and material quantities.

  • Details and penetrations

    Curbs, stacks, ducts and other penetrations each require their own detailing.

  • Code and insulation requirements

    The project must account for applicable code, permit, insulation and detail-height requirements. Confirm those requirements for the jurisdiction and proposed scope with the responsible project professionals.

Warranty and Care After Installation

Available manufacturer and workmanship coverage, eligibility, exclusions and owner obligations should be confirmed in writing for your project. Warranty terms vary by system and manufacturer.

Plan for maintenance after installation from the start, so visit records are kept alongside the warranty documents.

FAQ

Questions About Roof Replacement

Should I repair or replace my commercial roof?

The decision should follow the condition of the assembly, not age alone. Repair may suit limited problems on a serviceable roof, while widespread moisture or deterioration can call for a larger scope. An inspection helps establish which applies to each roof area.

How will a reroof affect my building?

Work is sequenced and phased for the project, with temporary weather protection planned. The effect on operations depends on access, staging, details and weather; the proposal should describe the phasing so you can plan around it.

Will a reroof require added insulation?

It may. Applicable energy code and permit requirements can affect insulation and detail heights. Confirm those requirements for your jurisdiction and scope with the responsible project professionals.

Can the new roof go over the existing one?

A recover may be possible where the existing assembly is suitable and code and manufacturer requirements allow it. Verified conditions decide whether recover or tear-off is appropriate.

Plan a Roof Replacement

Bloom works only with commercial and industrial properties. We don't roof homes. Start with what you know; roof details are optional.

Optional. Roof size, system, age or existing reports. Not needed to start the conversation.

What is happening, or what you would like to discuss.

By submitting this form, you agree that Bloom Roofing Systems may use the information you provide to respond to your request. We send your request to Bloom using our email and business-system service providers. We do not sell your information. Sending a request does not sign you up for marketing. See our Privacy Policy.

What Happens Next

  1. 01We review your question or project requirements.
  2. 02We contact you to clarify the appropriate next step.