Case Study · Plaza Deck Waterproofing

Courtyard Waterproofing at the
H.H. Dow Leadership Academy

Bloom crew on the newly installed waterproofing membrane across the H.H. Dow Academy courtyard, with The H Hotel clock tower behind.
The membrane in place across the courtyard deck, before the drainage mat, fill and pavers went down.

9,072

Square feet waterproofed

Midland, Michigan

80-mil

Sarnafil G476 membrane

Loose-laid system

EFVM

Leak detection

Installed under the membrane, tested in each area

1st place

Sika Sarnafil Project of the Year

Waterproofing category

Why It Had to Be Right the First Time

The H.H. Dow Leadership Academy sits inside The H Hotel in Midland. Its courtyard is built on a concrete deck over the garage, and water coming through that deck was dripping into the garage below, where gutters had been hung to catch it. The owners decided to replace the courtyard waterproofing as part of the hotel's extensive renovations and additions.

Once finished, the waterproofing would sit under insulation, four large circular planters and decorative brick pavers. Reaching it later for a repair would mean taking the courtyard apart, so the installation had one chance to be done right.

The project team

Owners: Dow Chemical Company and Acquest Development, Inc. Construction manager: The Christman Company, Lansing. Waterproofing contractor: Bloom Roofing Systems.

Why a membrane

The owners compared fluid-applied hot tar and spray-applied systems before selecting the Sika Sarnafil membrane. The construction manager also needed one system that could go onto the new construction and replace the leaking one.

The assembly

Built in Layers, Tested Before It Was Covered

Each layer had a job, and the leak-detection layer was proven in every area before anything went on top of it.

Floor steps up as much as

4 inches

Carried to the drains with tapered insulation.

  1. 01

    Tapered insulation to every drain

    A full tapered insulation system sloped each area toward its drain, including the places where the floor stepped up four inches.

  2. 02

    Leak detection, tested area by area

    A foil-faced Electric Field Vector Mapping (EFVM) sheet went down under the membrane. Its low-voltage circuitry monitors for leaks and locates them. It was activated and tested in each area.

  3. 03

    Protection layer

    An NWP protection layer went over the leak-detection sheet.

  4. 04

    80-mil Sarnafil G476 membrane

    The loose-laid membrane covered the deck and was flashed at the brick walls and around the planters.

  5. 05

    Drainage mat, then fill

    A drainage mat went down before the bulk fill material, ready for the courtyard finishes above.

The Hard Parts

Bloom roofer flashing the curved wall of a circular planter inside a temporary winter enclosure at the H.H. Dow Academy courtyard.
Flashing a circular planter inside a temporary enclosure during the winter installation.

Flashing behind the brick

The existing flashings had not been terminated properly and covered only the middle portion of the brick walls. When Tom Bloom saw that, his call was to take the brick out and flash behind it. The mason could remove brick and mortar only in sections, or the wall would come down, so Bloom flashed behind each opening before the mason reset it and moved to the next section.

Mortar in a Michigan winter

The work ran through what Bloom's project lead called one of Michigan's harshest winters. The brick had to be warm for the mortar to cure, and The Christman Company built poly tents to keep the work warm.

Level changes and off-center drains

Floor levels stepped up as much as four inches in places, so the tapered system had to carry water to the drains across every change. The larger round planters were harder still, because their drains were not in the middle.

A working hotel and academy

Some days the crew could not work because of functions at the facility. Noisy work was scheduled for times without classes or events, and a wedding booked soon after the completion date made the finish date firm.

Project photos

From Bare Deck to Finished Courtyard

  • Tapered insulation boards laid across the courtyard deck around the circular planters, with the clock tower beyond.
  • Aerial view of the waterproofing membrane across the courtyard deck and around the circular planters.
  • Waterproofing membrane across the courtyard with drain extensions standing up through it.
  • Membrane carried up and around a circular planter and along the courtyard walls.
  • Bloom crew working across the membrane in the courtyard, with The H Hotel tower behind.
  • Completed planting beds and walkway in the finished courtyard.
  • Finished paver courtyard with circular planters, trees and benches in front of The H Hotel.
  • Decorative brick pavers in the finished courtyard outside the academy.
  • The H Hotel entrance and clock tower in Midland, Michigan.

As quoted in Sika Sarnafil's project profile

What the Project Team Said

“This is one of the most detailed and tedious waterproofing jobs we've ever done. Bloom Roofing had the right talent and did an outstanding job.”
Jeff AdcockProject Manager, The Christman Company
“Bloom Roofing went above and beyond in this challenging application.”
John LowryVice President, Acquest Development, co-owner of The H Hotel

The Documented Outcome

Bloom earned First Place in the Waterproofing category of Sika Sarnafil's Project of the Year.

In Sika's follow-up, John Lowry reported that the system was performing well. The only leak he described was caused by a drain malfunction, and the EFVM system identified it easily. That is the value of building leak detection in: a problem under a finished courtyard can be located instead of searched for.

What this means for your building

Plaza decks, courtyards, planters and green areas over occupied space bury their waterproofing for the life of the finishes. The terminations, the slope to each drain and the ability to find a leak later all have to be settled before anything covers them.

Related: Sika Sarnafil's project profile · Institutional and government work · Our services · More case studies · commercial roofing in Flint and Saginaw

Waterproofing That Will Be
Covered for Good?

When pavers, planters or a building finish will sit on top of the waterproofing, the details only get one chance. Tell us what goes on top and what is underneath, and we will start from the conditions.