Bloom removed the existing roof membrane and insulation at a Detroit automotive supplier's facility and installed polyiso insulation with a 60-mil TPO system across 92,861 square feet. The project required coordination with personnel working below the roof.

Automotive supplier facility

Building

Detroit, MI

Location

92,861 sq ft

Roof area updated

60-mil TPO over polyiso

Roof system

The Customer Requirement

The facility's existing roofing was worn and deteriorated, and the work had to be coordinated with personnel working directly below the roof.

Bloom's Work

Bloom removed the existing membrane and insulation, installed new polyiso insulation and completed a 60-mil TPO roofing system across 92,861 square feet.

The Documented Outcome

The project replaced the roof above the working facility. The client's roofing manager described the work this way:

“Bloom Roofing has the capabilities to manage difficult scenarios with personnel working directly below the roof construction.” Matthew Norman, North American Roofing Manager, Johnson Controls, Inc.

Related: Manufacturing roofing · Roof replacement · commercial roofing in Metro Detroit

Let's Plan the Right Next Step
for Your Building

Tell us about your roof concerns and building requirements. Start with an inspection or assessment, then consider maintenance, repairs or larger work according to the roof's condition.